At a glance
- FIFA confirmed Morocco, Spain and Portugal as joint hosts of the 2030 World Cup on 11 December 2024.
- The 430 km Kenitra–Marrakech high-speed line carries MAD 53 billion in infrastructure and equipment spending, with commercial service scheduled for November 2029.
- A MAD 38 billion airport programme (2025–2030) includes a MAD 12.8 billion new terminal at Casablanca Mohammed V, due by mid-2029.
- The new Grand Stade Hassan II near Casablanca is designed for about 115,000 spectators; contracts and tenders announced in 2026 alone exceed MAD 6 billion.
- Morocco welcomed 19.8 million tourists in 2025, including about 200,000 from China, nearly double the 2024 figure.
Morocco has just come through one major tournament. It hosted the 2025 Africa Cup of Nations, which ended on 18 January 2026 at Rabat's Prince Moulay Abdellah Stadium, where Senegal beat the hosts 1–0 after extra time.
The bigger prize is still ahead. According to FIFA, the 2030 World Cup will be hosted by Morocco, Portugal and Spain, with three centenary matches played in Argentina, Paraguay and Uruguay.
Between now and 2030, Morocco is building rail, airports, stadiums, roads and hotels at the same time. For Chinese companies, that means a fixed deadline, published budgets and concentrated procurement: a clear window, though not an open door for everyone. The firms that do well will be the ones that pick their spot early.
High-speed rail: Chinese contractors are already on site
The Kenitra–Marrakech line is the backbone of the programme. Le360 puts the wider rail plan at MAD 96 billion: MAD 53 billion for the high-speed infrastructure and equipment, MAD 29 billion for 168 trains and MAD 14 billion for the existing network. By April 2026, 15 viaducts were under construction and 92 bridge structures had been started. Around 150 companies were directly involved, nearly two-thirds of them Moroccan.
Several Chinese groups have won publicly reported packages:
| Company | Scope | Value / volume |
|---|---|---|
| China Railway No.4 Engineering | Civil works, lot 1 | MAD 3.4 bn |
| Shandong Hi-Speed Engineering Construction | Civil works, lot 2 (about 63 km) | MAD 4.05 bn |
| China Gezhouba Group | Six viaducts | MAD 2.32 bn |
| China Railway Construction Corp. (CRCC) | 60,000 tonnes of rail | Not disclosed |
| CSCEC Steel Structure | Steel structures | 12,600 tonnes of steel |
Sources: TelQuel, TelQuel, Xinhua, Hespress, Hespress
The road network tells a similar story. Xinhua reports that Shandong Hi-Speed Group won lot 2 of the new Rabat–Casablanca motorway in March 2025. Hespress reported in September 2025 that CSCEC Steel Structure, entering Morocco for the first time, is also supplying 15,600 tonnes of steel bridges for the second phase of the motorway programme.
Rolling stock went elsewhere. In February 2025 the national railway ONCF awarded up to 168 trains: 12 high-speed sets from Alstom, 30 inter-city trains from Spain's CAF, and 110 double-deck suburban units from South Korea's Hyundai Rotem under a contract of about EUR 1.47 billion that includes technology-transfer and localisation requirements (Railway Gazette).
Case study: how one rail package was won
Civil works lot 2 is a useful example of what competition looks like. According to TelQuel, the package covers earthworks, bridge structures, restoration of communications and fencing. Four companies bid:
| Bidder | Bid |
|---|---|
| Shandong Hi-Speed Engineering Construction (winner) | MAD 4.05 bn |
| China Overseas Engineering Group | MAD 4.25 bn |
| CRCC 20 | MAD 4.3 bn |
| TGCC (Morocco) | MAD 4.7 bn |
Three of the four bidders were Chinese, and price decided it. Two lessons follow. Chinese contractors are now a familiar presence in Moroccan public works, so competition among them is stiff. And for works packages, the price offer still carries decisive weight.
The same report lists much smaller packages tendered alongside: a mobile rail-welding workshop at about MAD 102 million, and bridge works on the Rabat Agdal–Ain Atiq section at about MAD 73 million over 10 months. For an SME, packages in the tens of millions of dirhams, and the subcontracts and purchasing that sit beneath the big contracts, are the realistic entry point.
Stadiums and airports: big budgets, mostly local prime contractors
A 2023 report by FNH put planned stadium spending for AFCON and the World Cup at over MAD 20 billion, covering upgrades in Tangier, Casablanca, Rabat, Agadir, Marrakech and Fez, plus a new stadium at Benslimane.
That new stadium, the Grand Stade Hassan II, is the flagship. The main build went to a joint venture of Moroccan contractors TGCC and SGTM for about USD 320 million, with roughly 30 months of works and completion slated for 2028 (Inside World Football). The same partnership took the roof and façade package, worth more than MAD 3.7 billion and specified to Eurocode standards (Hespress). In August 2026 the public works agency tendered three further lots worth an estimated MAD 3.05 billion: external works, the hybrid pitch with drainage and pitch lighting, and spectator, VIP and media seating, the last valued at about MAD 277 million (Le360).
On airports, the government and the national airports office ONDA signed a MAD 38 billion agreement in July 2025, covering a new international airport in Casablanca and expansions at seven other World Cup host cities, with the aim of lifting national capacity to 80 million passengers a year (Hespress).
One of the heaviest single items is the new terminal at Casablanca Mohammed V. Morocco World News reported in January 2026 that SGTM and TGCC, in equal shares, won the MAD 12.8 billion contract. It covers a terminal of about 600,000 m², a 3,700 m parallel runway and a control tower of around 42 m. Initial capacity is 20 million passengers a year, expandable to 30 million, with 40 months of works and completion targeted for mid-2029. Of the 28 firms that expressed interest in 2025, nearly half were Chinese, including Sinohydro and China Civil Engineering Construction, yet only the Moroccan consortium remained at the final stage.
The six host cities at a glance
Morocco will stage World Cup matches in six stadiums (Olympics.com). Five were already in use for AFCON 2025; capacities below are from Yabiladi (December 2025).
| City | Stadium | Capacity | Status |
|---|---|---|---|
| Casablanca (Benslimane) | Grand Stade Hassan II | About 115,000 (design) | Under construction, due 2028 |
| Rabat | Prince Moulay Abdellah | 69,500 | Reopened 5 September 2025 |
| Tangier | Grand Stade de Tanger | 68,000 | Hosted AFCON 2025 |
| Agadir | Grand Stade d'Agadir | 45,480 | Planned expansion to about 70,000 |
| Marrakech | Grand Stade de Marrakech | 45,240 | Hosted AFCON 2025 |
| Fez | Complexe Sportif de Fès | 45,000 | Hosted AFCON 2025 |
Each host city also brings airport works, hotels, roads and urban renewal. Casablanca and Rabat sit where the new rail line and the new terminal meet; Tangier links the port and its industrial zones; Marrakech and Agadir are tourism-led. Match your product to the kind of project, then choose the city.
Tourism and hotels: the demand is already arriving
Tourism ministry figures show 19.8 million visitors in 2025, up 14% year on year, and MAD 124 billion in foreign-currency receipts over January–November, up 19% (Hespress). The official goal is 26 million visitors by 2030.
Chinese arrivals are growing quickly from a small base. Morocco's ambassador to China said in May 2026 that about 200,000 Chinese tourists visited in 2025, against roughly 106,000 in 2024 (Hespress). Air links help: Royal Air Maroc resumed direct Beijing–Casablanca flights in January 2025, three times a week (Beijing municipal government), and China Eastern's Shanghai Airlines launched Shanghai–Casablanca the same month, three times a week with a stop in Marseille (AirlineGeeks).
That growth feeds new hotel builds and renovations, and demand for catering, transport, guiding and Chinese-language services.
A practical route in for SMEs: five steps
1. Pick your entry point. Decide whether you will supply the main contractors or bid for smaller public packages yourself. Supplying is easier to start; bidding needs local standing and references.
2. Set up a Moroccan entity. Under Decree 2.22.431, as summarised by Challenge, national tenders of up to MAD 10 million for works and MAD 1 million for supplies and services are restricted to firms based in Morocco. Without a local company, that whole tier is closed to you.
3. Get certification and French documents ready. Stadium packages reference Eurocodes, so building, electrical and fire-safety products need suitable test reports and certification. Technical files are usually expected in French.
4. Learn the e-procurement system. Bids are now submitted and opened electronically on the public procurement portal. Contracts up to MAD 1 million can use a simplified open tender with at least 10 days' notice and no reference certificates in the technical file, which suits newcomers.
5. Approach the main contractors. TGCC, SGTM and the Chinese contractors already in Morocco typically buy materials and subcontract work. Turning up with samples, prices and lead times is more productive than chasing prime contracts.
The challenges
The opportunity is real, but so are the barriers.
Large contracts go to large firms. Rail civil works were contested by major Chinese state-owned groups; the stadium and the new Casablanca terminal went to Morocco's own construction heavyweights.
Local preference is written into the rules. Bids from companies not established in Morocco are adjusted by 15%, and public buyers must reserve 30% of their planned annual procurement for Moroccan-based small and medium-sized firms (Challenge). A local entity and a dependable local partner are often prerequisites.
Standards and language take time and money. European certification and French documentation are not optional extras.
Payment terms need planning. The national payment-delays observatory reported an average of 32.5 days for public bodies in 2025, but 12 entities still averaged over 90 days (AllAfrica/Libération).
Finally, mind the calendar in both directions. Most projects must finish in 2028–2029, so starting now is not early. And construction demand will ease after the tournament, so a sound plan also looks at maintenance, operations and the civilian market.
Six questions to ask before you invest
- Which project type does my product serve: rail, airports, stadiums, roads, or hotels and tourism?
- Do I hold European certification or acceptable test reports, and can I supply technical files in French?
- Will I register a Moroccan company, and who will run it and meet clients on the ground?
- Can my cash flow absorb payment cycles of 60 to 90 days or longer?
- Do I have a reliable local partner: a distributor, an installation crew or a contractor relationship?
- Will this business still have a market in Morocco after 2030?
What it means for Chinese businesses
- Building materials and steel structures: bridges, stations, stadium roofs and terminals use large volumes of steel; fabricators, precast suppliers, waterproofing and façade specialists can approach main contractors and their subcontractors.
- Lighting and MEP: stadium and pitch lighting, electrical, HVAC and lifts for stations and terminals, plus renewable-energy equipment.
- Security and smart systems: CCTV, access control, ticketing gates and fire alarms for stadiums and transport hubs.
- Seating, furniture and hospitality supplies: stadium seating is tendered as a separate lot, and new or refurbished hotels need furniture, linen, kitchen and guest-room supplies.
- Tourism services: with Chinese arrivals now near 200,000 a year, fans and business delegations need Chinese-speaking reception, itineraries and interpreting.
The practical route for most SMEs: set up a Moroccan entity or work with a local distributor, get product certification in order, then enter projects through the main contractors' supply chains rather than bidding for prime contracts directly.
Sources
- FIFA: Extraordinary Congress appoints hosts of 2030 and 2034 World Cups
- Africanews: Senegal stun Morocco in AFCON 2025 final
- Le360: Kenitra–Marrakech high-speed line one year on
- TelQuel: A second Chinese company joins the high-speed line
- TelQuel: China Gezhouba secures viaduct contract
- Xinhua: Chinese firms in Morocco's transport infrastructure (23 May 2025)
- Hespress: CRCC to supply rails for the high-speed line
- Hespress: CSCEC enters the Moroccan market
- Railway Gazette: Morocco orders high-speed, inter-city and suburban trains
- FNH: Over MAD 20 billion for AFCON and World Cup stadiums
- Inside World Football: Main build contract for the Casablanca stadium
- Hespress: Benslimane stadium roof and façade contract
- Le360: MAD 3.05 billion in new Grand Stade Hassan II tenders
- Hespress: MAD 38 billion airport investment protocol
- Morocco World News: SGTM-TGCC win Mohammed V terminal contract
- Olympics.com: 2030 World Cup stadiums
- Yabiladi: AFCON 2025 stadium line-up
- Hespress: Morocco nears 20 million tourists in 2025
- Hespress: Chinese tourism to Morocco doubles (May 2026)
- Beijing municipal government: Royal Air Maroc resumes direct Casablanca–Beijing flights
- AirlineGeeks: Shanghai Airlines to launch Casablanca route via Marseille
- Challenge: What the new public procurement decree provides
- AllAfrica/Libération: Payment delays report for 2025
Information as of November 2026, for general reference only; not investment advice.